viernes, 11 de septiembre de 2020

ACWA Power tests wind ahead of Azerbaijani build-out – Wind Power Monthly

Photo: Acwa Power
Saudi developer ACWA Power has installed six wind measuring and monitoring stations to determine the best turbine positions at the site of a planned 240MW wind farm in eastern Azerbaijan. Wind measurements will be carried out over 9-12 months, the Azerbaijani energy ministry stated.

Click on this link to read the rest of the report.


No hay comentarios:

Publicar un comentario