|
Photo: Acwa Power
|
Saudi developer ACWA Power has
installed six wind measuring and monitoring stations to determine the best
turbine positions at the site of a planned 240MW wind farm in eastern
Azerbaijan. Wind measurements will be carried out over 9-12 months, the
Azerbaijani energy ministry stated.
Click on this link to read the rest of the report.
No hay comentarios:
Publicar un comentario