miércoles, 28 de junio de 2023

Hydropower’s full potential: emulator optimises designs and operations in real time, by Caitlin McDermott-Murphy – EnergyPost

Referential Photo
Hydropower plants are big and expensive. And no two plants are the same, located in different geographies. That makes it very hard to customise and test their design. Contrast that with other clean energy technologies like wind and solar, which are much easier to model…

Click on this link to read the rest of the report.


No hay comentarios:

Publicar un comentario